Stage and performance
Plan a small recording session around a shot or track list
List each shot or track as a segment, then attach who is needed, what must be set up, what you expect to have afterward and how long it may take. Add the allowances up against the time you have, then trim or reorder before the day.
Session date, location and time available: [ ] Approval for location: [ ] Segment or track: [ ] Participants: [ ] Setup and gear: [ ] Different from previous setup: [yes / no] Expected output: [ ] Time allowance: [ ] Basis for the estimate: [ ] Basis for planned use (ownership, agreement, license or other): [ ] Permission still needed and from whom: [ ] Status and supporting document: [ ] Total planned time: [ ] Time available: [ ] Segment to cut or move if short: [ ]
Why plans overrun
Add the time allowances and compare the sum with the session length, including setup and any move between spots. A segment that needs different gear or lighting from the one before it takes more than its recording time. Check that the people listed can be present when their segments occur. Record the basis for the planned location, performance and music use, including existing agreements or licenses. Identify any permission still needed without assuming every item requires a new grant. Confirm the equipment list covers each setup. If the total does not fit, name what moves.
Check setup changes, time totals and participant availability against the information supplied. Identify missing gear. For planned uses of locations, performances or music, flag an undocumented basis or a permission marked necessary but unresolved. Do not assume a new permission is required when an applicable basis is already documented.
Test the setup and settle approvals
Try the first and most complicated setups before the session where practical, and use the observed times to improve your estimates. Check the basis for each planned use of the location, performances and music, retaining existing agreements and obtaining any permission still required. Decide which segments move if time runs short, then share the confirmed plan with participants.