Home project planning
Keep a decision log during a renovation
A decision log lists what was chosen, who approved it, when, and which work it touches. It also holds open questions and rejected options. Keep it in one place so a disputed choice can be checked against the source document, not against memory.
Project and location: [ ] Contractor contact: [ ] Decision number: [ ] Decision needed: [ ] Options considered: [ ] Approved choice: [ ] Date approved: [ ] Approved by: [ ] Owner of follow-up: [ ] Work or materials affected: [ ] Contractor confirmed (yes or no, date): [ ] Unresolved alternatives: [ ] Change to an earlier decision, if any: [ ]
Gaps a decision log can hide
A log can look complete while a choice has never been confirmed by the person doing the work. A tile change may alter ordering time, and a moved outlet may affect another trade. Check that every entry names an owner and a date as well as a result. Look for decisions recorded as agreed when only one side said so. Rejected options deserve a line too, since they explain why something was not done. An entry that states a preference without naming the task or material it changes is hard to act on.
Go through each logged decision and find the ones where the contractor has not confirmed the consequences. List each with the missing confirmation named, such as schedule, cost or effect on other trades. Do not treat silence or a casual comment as approval.
Share and update the log
Send the current log to the contractor and ask them to confirm or correct each entry that affects their work. Record their replies with dates. Review open items at each check-in and assign someone to resolve each one. When a decision changes, add a new entry and leave the old one in place so the history stays readable.