pingpong

Business operations

Write an opening checklist for a small business

List what must be ready before the first customer is served, using your business's current procedures. For each task, state who performs it, how completion is confirmed and who handles an exception. Keep the required opening checks visible even when a specialist must complete part of the work.

A text to start with

I run [type of business] with [number] staff. Before we serve customers we usually do these things: [rough list of opening tasks]. Draft an opening checklist grouped by area. For each check, give the expected condition, who is responsible, and what to do when the condition is not met. Separate daily checks from things done weekly or less often. Produce a draft only and add no tasks I did not list.

Example request. Change the details to fit your situation.

Opening checklist worksheet

Business and location: [ ] Procedure version and checklist owner: [ ] Last reviewed: [ ] Area and task: [ ] Required frequency: [ ] Expected duration: [ ] Who may perform it: [ ] Expected result and verification method: [ ] Completion confirmation: [ ] Exception contact or next action: [ ] Must be complete before opening: [ ] Repeat for each task. Specialist work needed before opening: [ ] Who confirms that work is complete: [ ] Other scheduled maintenance and location of its list: [ ]

Daily routine versus occasional work

Compare the draft with your current procedures. A daily check may take longer than a visual inspection or require someone with specific training. Record its actual frequency, expected duration and method of verification. If a specialist must act before opening, keep that dependency on the checklist and name who confirms completion. Separate less frequent work without removing any required daily checks. Look for tasks that rely on one person's memory and ask that person to supply the missing steps.

Ask another agent to check the result

Compare this opening checklist with the procedures I supply. Flag missing daily checks, unsupported changes to frequency or duration, and tasks assigned to someone without the stated training. Check that specialist work needed before opening has a completion contact. Quote the procedure supporting each proposed correction; do not invent new requirements.

Run it before relying on it

Walk through one real opening with a printed copy and mark each item that was unclear, missing or slow. Ask the person who opens most often what the draft leaves out. Decide who may edit the list and where the current version lives, then replace old copies wherever they are posted. Revisit the list after any change in layout or equipment.